Exclusive: Houston energy engineering co. in talks to lease Energy Center Five

The building was developed speculatively in 2013, delivered in 2016, […]

Read the original post by Cara Smith

This entry was posted in Uncategorized. Bookmark the permalink. Trackbacks are closed, but you can post a comment.

Post a Comment

You must be logged in to post a comment.

  • Pages

  • Archives

  • Switch to our mobile site